Education
Projects
Education
The design of educational buildings needs to inspire learning and creativity amongst their students. At the same time, consider factors such as acoustic properties, air quality and increasing focus on operational spend, durability and maintenance costs.
There’s also high peaks of foot traffic in-between classes where corridors have to deal with foot traffic from all directions and with strict timetables, term time repairs need to be quickly applied to minimise disruption. Here ARDEX Fast Track products offer high performance and incredibly fast installation, for example ARDITEX NA Levelling and Smoothing Compound reduces the need for intensive preparation and priming and allows you to apply floorcoverings from as little as 3 hours.
Projects in Education
-
Franklin Sixth Form College, Lincolnshire
-
ARDEX Return for V & A Museum Expansion
A full ARDEX system was used in the new exterior courtyard, as part of a £53.5million expansion project
-
Peterborough Regional College
ARDEX teams up with top flooring contractor on major refurbishment project to avoid class disruptions
-
Mearns Castle High School
ARDEX provided the ultimate moisture control solution within a tight time frame
-
V & A Gets Artistic Renovation
Issues with moisture and old bitumen flooring adhesive, added to strict rules of practice, called for a system solution from ARDEX
-
St George’s Court
Home of the MOD and other government departments, the architect required a unique design that could not be achieved with a standard tile
-
Prestigious Refurbishment for the Scottish Parliament
PanDOMO helped to make the Scottish Parliament one of the most innovative architectural designs in the UK
-
Loughborough College
Some substrates contained bitumen, or old adhesive residues, whilst others had uneven and damaged concrete with rising damp. ARDITEX NA was the only solution.