Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

Cement Based Tile Adhesives

Products

Thick Bed Tile Adhesive

ARDEX X 325 PTB

  • Apply 3-25mm thick to level uneven floors and fix tiles in a single application
  • Solid bed fix large format floor tiles without back-buttering
  • Grout after just 3 hours
ARDEX X 325 PTB Pourable Thick Bed Tile Adhesive
Images and Videos
  • ARDEX X 325 PTB Pourable Thick Bed Tile Adhesive
  • ARDEX X 325 PTB Pourable Thick Bed Tile Adhesive
  • ARDEX X 325 PTB Pourable Thick Bed Tile Adhesive
  • ARDEX X 325 PTB Pourable Thick Bed Tile Adhesive showing solid bed fixing

Consumption Calculator ARDEX X 325 PTB

Select

Result

The number of kg required

0

The number of units required for your project

0

The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage