An 85mm deep screed walkable faster than the journey time from Platform 6 to Newcastle!

ARDEX ‘On Track’ at King’s Cross New Ticket Hall

4,300m² of screeding, tiling and grouting was installed in the new state-of-the-art ticket hall

ARDEX ‘On Track’ at King’s Cross New Ticket Hall

ARDEX worked alongside DMC Rail Ltd of Tilbury, Essex to provide a 4,300m2 screeding, tiling and grouting solution for the new, state-of-the-art Northern ticket hall at King’s Cross St Pancras Underground station.  The new ticket hall funded by the DfT, is the latest improvement to be delivered as part of Transport for London’s Investment Programme.

The ticket hall required a durable, flat and smooth floor surface, which could receive a floorcovering at the earliest possible opportunity.  With an excellent track record for successful commercial flooring installations, ARDEX A 35 Ultra Rapid Drying Cement for Internal and External Screeds was installed at 85mm thick.  ARDEX A 35 can be walked on after only 3 hours and rapid drying times mean floorcoverings can be installed after just 24 hours, significantly reducing down time.  A wait of at least a month would have been required before a standard cement/sand screed would be hard and dry enough for further work to proceed.

The new large format tiles were fixed using ARDEX S 21 Rapid Hardening Floor Tile Bedding Mortar.  The inherent hardening properties of ARDEX S 21 allow walkability and further work to commence after only 3 hours, once again reducing valuable down time.

The tile joints were grouted with ARDEX–FLEX FL Rapid Setting Flexible Tile Grout in Grey.  Specifically developed for use with wide tile joints from 3-15mm, ARDEX-FLEX FL is suitable for use with all types of tiles including porcelain, ceramic, most natural stone and quarry tiles, as well as extruded tiles and glass blockwork.  With key features including flexibility, water repellence, ease of application and dirt resistance, plus availability in 35 colours, ARDEX-FLEX Tile Grouts are a favoured choice with many professional tile fixers.

Dave McCartney of DMC Rail Ltd said “Teaming up with ARDEX to complete this prestigious project, not only assured proven product performance, but we also benefited from their outstanding technical support which was consistently excellent throughout the project”.