Old Street Station – London
ARDEX products have played a crucial role in the transformation of Old Street Station in central London.
Transport for London’s aim for the station was to create a safer, more welcoming environment for every traveller.
A crucial interchange station at the junction of Old Street and City Road for London Underground and National Rail services, the station was original opened in 1901, before being rebuilt in 1925 and again in 1968 replacing all surface buildings with a subsurface complex.
It was redeveloped again in 2014, before the latest refurbishment by Morgan Sindall Construction.
Tiling and finishing work was carried out by DMC Contracts on behalf of Morgan Sindall, with the station remaining open and accessible throughout the entire process.
DMC’s scope of work was extensive and included the use of a number of ARDEX products.
Floor surfaces were screeded with ARDEX A 38 screed, before Agglo Granazzocem C02 agglomerate granite tiles were fixed with ARDEX X 78 semi-pourable tile adhesive.
Walls were rendered with ARDEX AM 100 rapid-drying render, incorporating steel vertical and horizontal trims, before being finished with a final coat of ARDEX A 125 Fairing Coat.
Adam Willmott, Head of Business Development at ARDEX said: “This was a great project to be involved with and we are delighted that ARDEX systems were used throughout the renovation by our friends at DMC Contracts.
“As an approved supplier for Transport for London (TfL) we have supplied products to many London Underground projects including the award-winning Elizabeth Line.
“ARDEX products are perfect for use at train and tube stations, because they can be installed quickly and perform to a high standard. This is important because station closures can lead to revenue losses.
“Our Fast Track Products allow station flooring to be screeded, tiled and ready to receive traffic between the last train at night and the first train the very next morning.”
Main Contractor: Morgan Sindall
Tiling Contractor: DMC Contracts
Products used for this project
-
ARDEX AM 100
Rapid Set One Coat Tiling Render
- Tiles can be fixed in as little as 2 hours
- Apply from 2-30mm in a single application
-
ARDEX X 78 S
MICROTEC® Flexible Rapid Set Semi-Pourable Floor Tile Adhesive
- Semi-pourable consistency ideal for solid bed fixing large format floor tiles
- Tiles can be trafficked and grouted 90 minutes after fixing
-
Ultra Rapid Drying Cement for Internal Screeds
ARDEX A 35
- Walkable in 3 hours
- Receives floorcoverings after 24 hours, regardless of thickness
-
ARDEX A 125
Fairing Coat & Fine Repair Mortar
- Receives finishes the next day
- Extended 4 hour pot life
More projects in Transport
-
Old Street Station – London
From “Old to New” - ARDEX products specified for Old Street Station transformation
-
ARDEX Departs on Time at Heathrow’s Terminal 1
ARDEX’s advanced flooring products assured a perfect installation was completed on schedule
-
ARDEX ‘On Track’ at King’s Cross New Ticket Hall
An 85mm deep screed walkable faster than the journey time from Platform 6 to Newcastle!
-
ARDEX Help Nottingham Train Station
ARDEX provided a complete system of products as part of a £150m investment plan
-
ARDEX Renovation Proves Soaring Success
One of the most significant and comprehensive upgrades to Glasgow Airport since it opened in 1966
-
Piccadilly Circus Underground Station
500,000 tiles were fixed in 1984 using ARDEX products, and remain fully bonded today