Transport
Projects
Transport
Transport hubs such as train or tube stations, and airports can endure some of largest number of visitors for any public space. Meaning the performance of any installation has to be of the highest standard in order to cope.
Quick installation is another crucial factor for the transport industry. Any closures of stations of terminals can lead to serious losses in revenue, which is why ARDEX products are continually specified for work on the London Underground. Our Fast Track Products allow station flooring to be screeded, tiled and ready to receive traffic between the last train at night and the first train the very next morning.
To learn more about the way we work and how we could support your team on your next project, please get in touch to speak to one of our experts.
Projects in Transport
-
Old Street Station – London
Refurbishment of London Underground Station using ARDEX AM 100, A 125, A 38 screed and tiled with ARDEX X 78
-
ARDEX Departs on Time at Heathrow’s Terminal 1
A 40,000m² flooring refurbishment of Heathrow Airport’s Terminal 1 helps 12 million passengers a year to experience a faster and more comfortable journey
-
ARDEX ‘On Track’ at King’s Cross New Ticket Hall
4,300m² of screeding, tiling and grouting was installed in the new state-of-the-art ticket hall
-
ARDEX Help Nottingham Train Station
ARDEX Fast Track products meant floorcoverings could be laid within hours and allowed the train station to remain open throughout the build
-
ARDEX Renovation Proves Soaring Success
3000m² of new flooring was installed over multiple substrates while the airport remained fully operational
-
Piccadilly Circus Underground Station
ARDEX met the challenges of a 4 hour fixing window between the station closing at night and reopening the next morning