Projects
Projects
- The success of ARDEX UK is measured by the success of our customers building and renovation projects, and we are proud of our outstanding track record. The synergy between cutting edge products and technical expertise, based on decades of experience, has proved a winning formula in some of the most prestigious building projects in the UK and abroad.
Projects
View categories below
-
ARDEX Help Nottingham Train Station
ARDEX Fast Track products meant floorcoverings could be laid within hours and allowed the train station to remain open throughout the build
-
ARDEX Renovation Proves Soaring Success
3000m² of new flooring was installed over multiple substrates while the airport remained fully operational
-
ARDEX Departs on Time at Heathrow’s Terminal 1
A 40,000m² flooring refurbishment of Heathrow Airport’s Terminal 1 helps 12 million passengers a year to experience a faster and more comfortable journey
-
Click on the button to see all projects regarding to the project category.
-
V & A Gets Artistic Renovation
Issues with moisture and old bitumen flooring adhesive, added to strict rules of practice, called for a system solution from ARDEX
-
Loughborough College
Some substrates contained bitumen, or old adhesive residues, whilst others had uneven and damaged concrete with rising damp. ARDITEX NA was the only solution.
-
Mearns Castle High School
ARDEX provided the ultimate moisture control solution within a tight time frame
-
Click on the button to see all projects regarding to the project category.
-
Royal Liverpool Golf Club
Golf Clubhouse Refurbishment for the 151st Men's British Open Championship using ARDEX Double-Stick Carpet Installation
-
David Lloyd Leisure Refurbishment
As part of a £50m group investment, the prestigious Colchester club needed 3500m² of tiling to cover the wet areas, walkways and reception areas
-
KCOM Stadium
ARDEX specified a fast track levelling, tiling and grouting solution to the multi-purpose facility
-
St George’s Chapel in Westminster Cathedral
1/2 million tesserae of Venetian glass and gold-faced tiles were fixed to the 120m² dome vault ceiling
-
Click on the button to see all projects regarding to the project category.
-
ARDEX Completes Selfridge’s Food Hall Refurbishment
Over 200 million visitors visit Selfridges every year. So when the iconic food hall needed renovating, only ARDEX products could achieve the speed and reliability needed
-
PanDOMO renovation of Wimbledon Monsoon store
Workers were walking over the levelled floor just 3 hours after applying ARDEX A 38, ensuring the store was open in time for the Wimbledon Tennis Championships
-
ARDEX styles 1920’s Barber Shop
PANDOMO LOFT pushed the boundaries of traditional floor design, offering the ability to produce intricate designs, coupled with a hard wearing finish
-
Installing 2500 x 1000mm Porcelain Tiles in Victoria Street
80-100 Victoria Street is a landmark commercial building needing 1600m² of newly installed floor tiles
-
Royal Bank of Scotland
ARDEX products protected the original Grade II listed tiles when installing 24 tonnes of granite slabs to the new floor
-
Click on the button to see all projects regarding to the project category.
-
ARDEX Undertakes Charity Project for Birmingham Children’s Hospital
ARDITEX NA was chosen for its versatility, and ability to cover problem subfloors with minimal preparation, ensuring disruption to the hospital and its patients was kept to a minimum
-
Aintree University Hospitals NHS Foundation Trust
Aintree University Hospitals NHS Foundation Trust is very proud of the latest addition to their ever expanding University Hospital Site
-
North Manchester General Hospital
1800m² Accident and Emergency department is refurbished using cost effective, fast track products from ARDEX
-
Click on the button to see all projects regarding to the project category.