Leisure
Projects
Woking Leisure Centre
In the heart of Woking, a story of craftsmanship and durability continues to unfold at the Woking Leisure Centre. This facility, beloved by the community, is more than just a place for recreation; it’s a showcase of enduring quality, thanks in part to the expert work of Adam Willmott and the exceptional products of ARDEX.
A Journey Back in Time
Recently, Adam Willmott, Head of Business Development at ARDEX returned to the leisure centre. His visit was to assess some remedial work needed on some stairwells, but it also served as a nostalgic journey back to a pivotal point in his career.
It was in 1992 when Adam, as a young 26 year-old, then working with Ceramic Tiles Ipswich (Contracts) Ltd, meticulously tiled the centre’s pool—a project that, more than 30 years later, still stands as a testament the quality of his work and the ARDEX products he used.
The ARDEX Advantage
The longevity of the pool’s stunning appearance is a testament to the superior quality of ARDEX products used during its construction. Adam and the team at CTI, used ARDEX X7 with the E90 additive, renowned for its flexibility and bond strength. The pool was grouted with ARDIPOX, an ARDEX epoxy grout system designed for heavy-duty applications.
These products have long been celebrated for their durability and ability to withstand the test of time, even under constant exposure to water and chemicals.
Pool tiles used were manufactured by Buchtal and supplied through a predecessor company to Spectile – who ARDEX still work closely with today.
Lasting Legacy
The fact that the pool retains its original quality and functionality over three decades later speaks volumes about the reliability and excellence of ARDEX systems.
It serves as a reminder of the importance of using high-quality and high-performing materials and skilled professionals.
More projects in Leisure
-
Woking Leisure Centre
A testament to enduring quality - leisure centre looking good 30 years later
-
Rose Terrace, Newmarket Racecourse
ARDEX Screed and Waterproofing Systems for new racecourse outdoor terrace bar and restaurant
-
Royal Liverpool Golf Club
Golf Clubhouse Refurbishment for the 151st Men's British Open Championship
-
Dream Pool Project, Staffordshire
Luxury Swimming Pool and Spa
-
Coalville Leisure Centre, Leicester
-
Evolution House at the Royal Botanic Gardens, Kew, London
-
Butlins Bognor Regis Pool Complex
-
The Royal Albert Hall
The perfect flooring solution for a world famous treasure
-
St Andrew Holborn
-
Where Old Meets New at Thames Lido
£3.5m restoration of a Grade II Listed Building originally opened in 1902
-
Glasgow Club Scotstoun Refurbishment
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
London 2012 Aquatics Centre
A fitting legacy from the 2012 London Olympics
-
Dundee’s New £31m Olympia Swimming Pool is Ready to Make a Splash
Old Olympia Centre replaced with state of the art facility
-
ARDEX Complete Commonwealth Games Pool Refurbishment in 8 Weeks
It’s a ‘Race to the Finish'
-
Port Solent’s Odeon Cinema Receives Premiere Refit
3 nights to complete and zero downtime
-
Gleneagles Hotel, Spa & Golf Resort
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
Elephant and Castle Leisure Centre
ARDEX help transform the Elephant and Castle area of London
-
Stratford Park Leisure Centre Swimming Pool
1000m² of tiling needing replacing at this 40 year old leisure centre
-
Duxford Air Museum
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
St George’s Chapel in Westminster Cathedral
18th century architecture meets 21st century art & technology
-
David Lloyd Leisure Refurbishment
Refurbishing Europe’s premier health & fitness provider
-
KCOM Stadium
ARDEX assist in an extensive refurbishment to the main foyer and reception area