Leisure
Projects
Elephant and Castle Leisure Centre
With a planned opening in spring 2016, this state-of-the-art facility is part of a massive redevelopment programme that will transform the Elephant and Castle area of London.
The £18.5m leisure centre, to be called the Castle, will be a fantastic asset to the local community, providing top-quality leisure facilities, which include a six-lane swimming pool, a learner pool with a movable floor, and a sauna with steam room facilities.
With over a hundred years of experience in constructing vital infrastructure, Balfour Beatty were selected to redevelop the new leisure centre, with the help from tiling subcontractor Elite Tiling Ltd, and ARDEX tiling products, which were used extensively on the 4000m2 project.
ARDEX MICROTEC X 77 Tile Adhesive was used on almost every part of the leisure centre, the pools, steam rooms, the atrium, staircases, and the waiting hubs on the 1st and 2nd floors. It was selected not only because it is ideal for ceramic tiling, but also because of its long open time of up to 60 minutes. This meant that the tilers could spread larger areas of adhesive in a single application, enabling them to work more efficiently, and allowing more time when tiling awkward areas, or cutting around fixtures and fittings in the pool and pool surrounds.
ARDEX EG 8 Cement/Hybrid Tile Grout has the chemical resistance associated with an epoxy-based grout, and, the ease of application of a cement-based grout. It’s versatile and easy to use, which meant it could be used for everything from the foot ledges in the swimming pools to the walls in the shower areas. John Oliver, ARDEX Area Sales Manager, commented “This project involved a large number of wet areas, so we needed to select products that were not only strong and durable, but were also waterproof. ARDEX EG 8 was ideal for the pools and showers, and Elite Tiling Ltd were very happy with the ease of application”.
“For the same reason, we also specified ARDEX-FLEX FL, a Rapid-Setting, Water-Repellent Tile Grout, for all the walls and floors of the wet areas, and ARDEX WPC Waterproof Coating for tanking the wall and floor areas in the showers and other wet areas.”
John concluded: “ARDEX products were used extensively throughout the leisure centre, and performed to the highest standard. The depth of our product range also helped solve a few issues that emerged during the redevelopment: for example, ARDEX P 82 Two Part Epoxy Primer was used as primer for the metal staircases after we realised that it was required to enable the correct substrate for fixing the tiles.”
Products used for this project
-
ARDEX WPC
Flexible Rapid Drying Waterproof Coating for Internal Wet Areas
- Ideal for filling holes & gaps, as well as general application
- Tile after 90 minutes
-
ARDEX X 77
MICROTEC® Flexible Standard Set Tile Adhesive
- Fix any tile size or type without slipping and without battens
- Spend less time mixing & more time fixing with a 3-hour pot life and 60 minute open time
-
ARDEX-FLEX FL
Flexible Rapid Set Tile Grout for Wide Joints
- For wall and floor tile joints 3-15mm wide
- Tiles can be trafficked after 90 minutes
More projects in Leisure
-
Rose Terrace, Newmarket Racecourse
ARDEX Screed and Waterproofing Systems for new racecourse outdoor terrace bar and restaurant
-
Royal Liverpool Golf Club
Golf Clubhouse Refurbishment for the 151st Men's British Open Championship
-
Dream Pool Project, Staffordshire
Luxury Swimming Pool and Spa
-
Coalville Leisure Centre, Leicester
-
Evolution House at the Royal Botanic Gardens, Kew, London
-
Butlins Bognor Regis Pool Complex
-
The Royal Albert Hall
The perfect flooring solution for a world famous treasure
-
St Andrew Holborn
-
Where Old Meets New at Thames Lido
£3.5m restoration of a Grade II Listed Building originally opened in 1902
-
Glasgow Club Scotstoun Refurbishment
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
London 2012 Aquatics Centre
A fitting legacy from the 2012 London Olympics
-
Dundee’s New £31m Olympia Swimming Pool is Ready to Make a Splash
Old Olympia Centre replaced with state of the art facility
-
ARDEX Complete Commonwealth Games Pool Refurbishment in 8 Weeks
It’s a ‘Race to the Finish'
-
Port Solent’s Odeon Cinema Receives Premiere Refit
3 nights to complete and zero downtime
-
Gleneagles Hotel, Spa & Golf Resort
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
Elephant and Castle Leisure Centre
ARDEX help transform the Elephant and Castle area of London
-
Stratford Park Leisure Centre Swimming Pool
1000m² of tiling needing replacing at this 40 year old leisure centre
-
Duxford Air Museum
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
St George’s Chapel in Westminster Cathedral
18th century architecture meets 21st century art & technology
-
David Lloyd Leisure Refurbishment
Refurbishing Europe’s premier health & fitness provider
-
KCOM Stadium
ARDEX assist in an extensive refurbishment to the main foyer and reception area