Leisure
Projects
St Andrew Holborn
St Andrew Holborn has stood as a Catholic Church for over 1000 years. Throughout its history it has received several major renovations, but it is most famously known for its late 17th century rebuild by the renowned architect Christopher Wren, who later went on to design one of London’s most recognisable and historic landmarks, St. Paul’s Cathedral. The latest large-scale works date back to the 1950s, and six decades on it was deemed in need of repair again.
Completed at the end of 2018, the latest refurbishments spanned the entire internal area of the church, including some 600m2 of flooring in the main church area and its surrounding rooms, as well as its vestibules and tower. Consisting of old vinyl tiling, it was worn and damaged and was replaced with new Hopton Wood Limestone, which was installed by Chichester Stoneworks. The existing base was also removed and replaced with a high-strength, rapid drying screed that could work within the client’s limited time constraints.
Having used ARDEX products on several other successful projects, Chichester Stoneworks contacted the ARDEX Business Development Team for specification advice. A full site visit helped ARDEX to understand the project and client requirements, who also provided compatibility testing between the limestone and potential fixing solutions. They provided the following specification:
- ARDEX A 38 Ultra Rapid Drying Cement for Internal and External Screeds
With RAPIDRY FORMULA Technology, ARDEX Screed Cements can be trafficked in 3 hours and natural stone installed after just 4 hours, regardless of thickness. An ARDEX Screed helps to significantly reduce project downtime in comparison to traditional sand and cement screeds, which can require months of drying before subsequent work can begin. - ARDEX A 18 Screed Bonding Cement with Colour Indicator
Provides a maximum adhesion strength bond between ARDEX Screed Cements and the substrates they are applied to, and a built-in colour indicator ensures screeds aren’t mistakenly applied into dry bonding slurries. - ARDEX K 15-HB High Build Raid Drying Levelling Compound
ARDEX K 15-HB can be applied from 5mm up to 35mm in single layer and is walkable after 2 hours regardless of thickness and provides a quick and flexible levelling solution. Like ARDEX S 28 Tile Adhesive below, it also incorporates RAPIDRY FORMULA Technology, helping to prevent moisture damage in moisture-sensitive natural stones like Limestone. - ARDEX S 28 MICROTEC Flexible Rapid Set Semi-Pourable Floor Stone & Tile Adhesive
Natural stone tiles, including Limestone, are susceptible to moisture damage caused by water migrating into them from the adhesive used to install them, and this can present as unsightly and permanent staining on the face of the tile and even warping of the tile body itself. Incorporating RAPIDRY FORMULA Technology, ARDEX S 28 locks the mix water in to prevent this from happening and helps to ensure a risk-free installation. It is also semi-pourable to help solid bed fix floor tiles with ease. - ARDEX-FLEX FS Flexible Standard Set Tile Grout for Narrow Joints
ARDEX-FLEX Tile Grouts are blended to a uniform consistency to provide consistent, streak-free results; and with 35 colours available, there’s a shade to suit any installation.
Before the tiling commenced, ARDEX also provided guidance on the use of the tiles, with a detailed report to summarise the compatibility testing they completed. For example, the Hopton Wood Limestone was reinforced by a resin mesh backing, and it was advised this be removed in accordance with Stone Federation guidance.
Support continued throughout the project, with the ARDEX Business Development Team always on-hand to provide specification advice and answer questions when required.
The works completed in December. Commenting on ARDEX’s involvement in the project, Chris Gladwell of Chichester Stoneworks said, “St Andrew Holborn has been an interesting and challenging project as we needed to install a new stone floor within the constraints of an existing building. Throughout the process ARDEX gave us technical support and advice on how to overcome some of the challenges we faced and assisted us with formulating a suitable specification for the screed, adhesive and grouts used.”
Products used for this project
-
Ultra Rapid Drying Cement for Internal & External Screeds
ARDEX A 38
- Walkable in 3 hours
- Fix ceramic and natural stone tiles after 4 hours
-
Screed Bonding Cement with Colour Indicator
ARDEX A 18
- Produces a slurry ideal for bonding ARDEX Screed Cements
- High adhesion strength
-
ARDEX K 15 HB
High Build, Rapid Drying Smoothing Compound
- Apply from 5mm to 35mm in one application
- Walkable in 2 hours regardless of thickness
-
ARDEX S 28 W
MICROTEC® Flexible Rapid Set Semi-Pourable Floor Tile & Stone Adhesive
- Minimises the risk of water staining, curling and warping in moisture-sensitive natural stone
- Semi-pourable consistency ideal for solid bed fixing large format floor tiles and slabs
-
ARDEX-FLEX FS
Flexible Standard Set Tile Grout for Narrow Joints
- Consistent, streak free finish
- For wall and floor tile joints up to 4mm wide
More projects in Leisure
-
Rose Terrace, Newmarket Racecourse
ARDEX Screed and Waterproofing Systems for new racecourse outdoor terrace bar and restaurant
-
Royal Liverpool Golf Club
Golf Clubhouse Refurbishment for the 151st Men's British Open Championship
-
Dream Pool Project, Staffordshire
Luxury Swimming Pool and Spa
-
Coalville Leisure Centre, Leicester
-
Evolution House at the Royal Botanic Gardens, Kew, London
-
Butlins Bognor Regis Pool Complex
-
The Royal Albert Hall
The perfect flooring solution for a world famous treasure
-
St Andrew Holborn
-
Where Old Meets New at Thames Lido
£3.5m restoration of a Grade II Listed Building originally opened in 1902
-
Glasgow Club Scotstoun Refurbishment
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
London 2012 Aquatics Centre
A fitting legacy from the 2012 London Olympics
-
Dundee’s New £31m Olympia Swimming Pool is Ready to Make a Splash
Old Olympia Centre replaced with state of the art facility
-
ARDEX Complete Commonwealth Games Pool Refurbishment in 8 Weeks
It’s a ‘Race to the Finish'
-
Port Solent’s Odeon Cinema Receives Premiere Refit
3 nights to complete and zero downtime
-
Gleneagles Hotel, Spa & Golf Resort
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
Elephant and Castle Leisure Centre
ARDEX help transform the Elephant and Castle area of London
-
Stratford Park Leisure Centre Swimming Pool
1000m² of tiling needing replacing at this 40 year old leisure centre
-
Duxford Air Museum
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
St George’s Chapel in Westminster Cathedral
18th century architecture meets 21st century art & technology
-
David Lloyd Leisure Refurbishment
Refurbishing Europe’s premier health & fitness provider
-
KCOM Stadium
ARDEX assist in an extensive refurbishment to the main foyer and reception area