ARDEX Specification Powers Major Refurbishment at Cowdenbeath Leisure Centre
Cowdenbeath Leisure Centre
ARDEX played a pivotal role in the successful delivery of this project, providing a full tiling specification and technical support from start to finish, supporting tiling contractors Edinburgh Tiling Contractors throughout the project.
Cowdenbeath Leisure Centre
ARDEX Specification Powers Major Refurbishment at Cowdenbeath Leisure Centre
Client: Fife Council
Main Tiling Contractor: Edinburgh Tiling Contractors
Project Duration: Summer 2024 – September 2025
ARDEX Support Team: Kyle McGuinness (Business Development Manager), Mick Bull (Area Sales Manager), James Hailstones (Training & Technical Support Manager)
Overview
Cowdenbeath Leisure Centre, a key community hub in Fife, Scotland, has reopened following a £7.8 million refurbishment.
The project, led by Fife Council and delivered by Fife Sports and Leisure Trust, aimed to modernise the facility and enhance its accessibility, sustainability, and user experience.
The upgrade included a new gym, fitness studio, refurbished swimming pool and changing areas, a relocated library, and improved external features.
ARDEX played a pivotal role in the successful delivery of this project, providing a full tiling specification and technical support from start to finish, supporting tiling contractors Edinburgh Tiling Contractors throughout the project.
Key products used on the project included ARDEX X 11 W semi-rapid tile adhesive for pool tiling and pool surrounds and ARDEX EG 18 Plus three-part epoxy grout for pool and changing room grouting – providing chemical and hygienic protection.
ARDEX Specification Highlights
- Swimming Pool Walls
- Preparation: Mechanised surface prep to expose aggregate.
- Products Specified:
- ARDEX A 46 – Rapid Setting Repair Mortar
- ARDEX AM 100 – Rapid Drying Tiling Render
- Swimming Pool Floors
- Preparation: Bonded screed required.
- Products Specified:
- ARDEX A 46 – Repair Mortar
- ARDEX A 18 – Bonding Agent
- ARDEX A 38 – Rapid Drying Cement
- ARDEX R3E – Epoxy Primer (optional)
- ARDEX K 301 – Concrete Resurfacing Compound (alternative method)
- Waterproofing Pool Shell
- Products Specified:
- ARDEX S 7 PLUS – Waterproof Membrane
- ARDEX SK-12, SK-90, SK-270 – Sealing Tapes and Gaskets
- Tiling to Pool Wall and Floor
- Products Specifed:
- ARDEX X 11 W – Floor Tile Adhesive
- ARDEX FLEX FL / FS – Grouts
- ARDEX E G 18 PLUS – Epoxy Grout (for aggressive water conditions)
- Drainage Channels
- Products Specified:
- ARDEX AM 100 – Render for sides
- ARDEX K 301 – Base Levelling
- ARDEX CA 20 P – Flexible Adhesive and Sealant
- ARDEX WPM 200 – Waterproofing Epoxy Membrane
- Pool Surround
- Preparation: Clean and abrade existing tiles and brickwork.
- Products Used:
- ARDEX AM 100 – Render
- ARDEX X 11 W – Tile Adhesive
- ARDEX FLEX FL / FS – Grouts
- ARDEX E G 18 PLUS – Epoxy Grout
- Changing Village (Wet & Dry Areas)
- Preparation: Mechanised surface prep and screeding.
- Products Used:
- ARDEX A 46 – Repair Mortar
- ARDEX A 18 – Bonding Agent
- ARDEX A 29 – Rapid Setting Cement
- ARDEX WPC – Waterproof Coating
- ARDITEX NA – Smoothing Compound (dry areas)
- ARDEX X 7 R / X 7 / X 11 W – Tile Adhesives
- ARDEX FLEX FL / FS – Grouts
- ARDEX E G 18 PLUS – Epoxy Grout
- ARDEX ST – Silicone Sealant
Outcome
The Cowdenbeath Leisure Centre reopened to the public on 29th September 2025, delivering a modern, inclusive, and multi-functional space for the community. ARDEX’s comprehensive specification and technical support ensured the highest standards of durability, safety, and performance across all tiling and waterproofing elements.
This project exemplifies ARDEX’s commitment to supporting public sector refurbishments with innovative solutions and expert guidance.
Products used for this project
-
ARDEX X 11 W
Enhanced Flexible S1 Tile Adhesive for Walls and Floors
- Spend less time mixing and more time fixing, with a 2.5 hour pot life and 45 minute open time
- Suitable for grouting in just 6-8 hours
-
ARDEX EG 18 PLUS
Easy to Apply & Clean Epoxy Tile Grout
- Cleans off in as little as 15 minutes and up to 60 minutes after application
- Easy to use with no special tools required
-
ARDEX AM 100
Rapid Set One Coat Tiling Render
- Tiles can be fixed in as little as 2 hours
- Apply from 2-30mm in a single application
-
ARDEX S 7 PLUS
Flexible Waterproof Coating for Swimming Pools
- Waterproof swimming pools prior to tiling
- Resists water pressures up to 5 Bar
-
ARDEX-FLEX FL
Flexible Rapid Set Tile Grout for Wide Joints
- For wall and floor tile joints 3-15mm wide
- Tiles can be trafficked after 90 minutes
-
ARDEX-FLEX FS
Flexible Standard Set Tile Grout for Narrow Joints
- Consistent, streak free finish
- For wall and floor tile joints up to 4mm wide
-
Liquid Waterproof Membrane
ARDEX WPM 200
- Provides a waterproof membrane and water vapour barrier
- Excellent adhesion to a variety of substrates
More projects in Leisure
-

Cowdenbeath Leisure Centre
ARDEX Specification Powers Major Refurbishment at Cowdenbeath Leisure Centre
-

Woking Leisure Centre
A testament to enduring quality - leisure centre looking good 30 years later
-
Rose Terrace, Newmarket Racecourse
ARDEX Screed and Waterproofing Systems for new racecourse outdoor terrace bar and restaurant
-
Royal Liverpool Golf Club
Golf Clubhouse Refurbishment for the 151st Men's British Open Championship
-
Dream Pool Project, Staffordshire
Luxury Swimming Pool and Spa
-
Coalville Leisure Centre, Leicester
-
Evolution House at the Royal Botanic Gardens, Kew, London
-
Butlins Bognor Regis Pool Complex
-
The Royal Albert Hall
The perfect flooring solution for a world famous treasure
-
St Andrew Holborn
-
Where Old Meets New at Thames Lido
£3.5m restoration of a Grade II Listed Building originally opened in 1902
-
Glasgow Club Scotstoun Refurbishment
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
London 2012 Aquatics Centre
A fitting legacy from the 2012 London Olympics
-
Dundee’s New £31m Olympia Swimming Pool is Ready to Make a Splash
Old Olympia Centre replaced with state of the art facility
-
ARDEX Complete Commonwealth Games Pool Refurbishment in 8 Weeks
It’s a ‘Race to the Finish'
-
Port Solent’s Odeon Cinema Receives Premiere Refit
3 nights to complete and zero downtime
-
Gleneagles Hotel, Spa & Golf Resort
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
Elephant and Castle Leisure Centre
ARDEX help transform the Elephant and Castle area of London
-
Stratford Park Leisure Centre Swimming Pool
1000m² of tiling needing replacing at this 40 year old leisure centre
-
Duxford Air Museum
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
St George’s Chapel in Westminster Cathedral
18th century architecture meets 21st century art & technology
-
David Lloyd Leisure Refurbishment
Refurbishing Europe’s premier health & fitness provider
-
KCOM Stadium
ARDEX assist in an extensive refurbishment to the main foyer and reception area