Dundee’s New £31m Olympia Swimming Pool is Ready to Make a Splash
ARDEX were delighted to work in partnership with specialist tiling contractor, The Tiling Company Northern, to supply the ideal tile fixing solution for the completion of a new swimming pool facility at Dundee’s £31m Olympia Leisure Centre.
The new building replaced the old Olympia Centre and includes a competition pool, toddler pool, and a wave and rapid river pool complete with the latest high-tech flumes for thrill seekers.
ARDEX MICROTEC X 77 Flexible Floor & Wall Tile Adhesive was the ideal solution for fixing all of the tiles in the new swimming pool, showers and changing rooms. ARDEX MICROTEC X 77 has an extended open time of up to 60 minutes, which means you can spread larger areas of adhesive in a single application, enabling fixers to work more efficiently, and allowing more time when tiling awkward areas, or cutting around fixtures and fittings in the pool and pool surrounds.
For a waterproof finish that is hygienic and impervious to chemical attack, ARDEX E G 8 Cement/Epoxy Hybrid Grout was used for the tile joints. Unlike traditional epoxy grouts, ARDEX EG 8 is easy to apply, requires no special tools and can be cleaned off the tile surface up to 45 minutes after application.
Chris Hutton from The Tiling Company Northern said “ARDEX products are extremely popular with our fixers as they are tried and tested in swimming pool installations. Furthermore, by specifying ARDEX X MICROTEC 77, we can confidently use one product for all areas, with no need for additional primers or additives.”
Minister for Sport Shona Robison said the complex would be a “Superb addition” to leisure facilities in Dundee, and it is hoped that this facility ‘will not only increase participation, but it will improve performance and deliver a lasting legacy from the 2014 Commonwealth Games.”
More projects in Leisure
-
Rose Terrace, Newmarket Racecourse
ARDEX Screed and Waterproofing Systems for new racecourse outdoor terrace bar and restaurant
-
Royal Liverpool Golf Club
Golf Clubhouse Refurbishment for the 151st Men's British Open Championship
-
Dream Pool Project, Staffordshire
Luxury Swimming Pool and Spa
-
Coalville Leisure Centre, Leicester
-
Evolution House at the Royal Botanic Gardens, Kew, London
-
Butlins Bognor Regis Pool Complex
-
The Royal Albert Hall
The perfect flooring solution for a world famous treasure
-
St Andrew Holborn
-
Where Old Meets New at Thames Lido
£3.5m restoration of a Grade II Listed Building originally opened in 1902
-
Glasgow Club Scotstoun Refurbishment
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
London 2012 Aquatics Centre
A fitting legacy from the 2012 London Olympics
-
Dundee’s New £31m Olympia Swimming Pool is Ready to Make a Splash
Old Olympia Centre replaced with state of the art facility
-
ARDEX Complete Commonwealth Games Pool Refurbishment in 8 Weeks
It’s a ‘Race to the Finish'
-
Port Solent’s Odeon Cinema Receives Premiere Refit
3 nights to complete and zero downtime
-
Gleneagles Hotel, Spa & Golf Resort
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
Elephant and Castle Leisure Centre
ARDEX help transform the Elephant and Castle area of London
-
Stratford Park Leisure Centre Swimming Pool
1000m² of tiling needing replacing at this 40 year old leisure centre
-
Duxford Air Museum
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
St George’s Chapel in Westminster Cathedral
18th century architecture meets 21st century art & technology
-
David Lloyd Leisure Refurbishment
Refurbishing Europe’s premier health & fitness provider
-
KCOM Stadium
ARDEX assist in an extensive refurbishment to the main foyer and reception area