The KCOM Stadium is a multi-purpose facility in the city of Kingston upon Hull, and was completed in 2002 following a £44 million build. The stadium is home to both Hull City Football Club and Hull Rugby League Club, and in spring 2016 the 170m² main foyer and reception area underwent an extensive refurbishment.
The condition of the floor required the existing ceramic tiles to be removed prior to levelling with ARDITEX NA, which offered a fast track solution to the project by allowing subsequent tiling to commence after just three hours.
The new 400 x 600mm ceramic tiles where then fixed with ARDEX MICROTEC X 78 S Tile Adhesive. The rapid drying properties of this product meant the contractor, Tony Saxby of TST Installations, was able to walk on and grout the tiles after just 90 minutes, and the semi-pourable consistency facilitated solid bed fixing.
ARDEX FLEX-FL Rapid Setting and Hardening Flexible Tile Grout in Silver Shimmer provided the perfect finish to the project, and Kevin Gale, ARDEX Area Sales Manager, commented “The system specified for this project was ideal for the quick turnaround that was needed. If the tiles on the original floor had been sound and well adhered, ARDITEX NA could have gone directly over them without priming; but in this situation, the tiles had to be removed and ARDITEX NA was used to pre-smooth the floor prior to tiling.”
Products used for this project
-
ARDEX X 78 S
MICROTEC® Flexible Rapid Set Semi-Pourable Floor Tile Adhesive
- Semi-pourable consistency ideal for solid bed fixing large format floor tiles
- Tiles can be trafficked and grouted 90 minutes after fixing
-
ARDEX-FLEX FL
Flexible Rapid Set Tile Grout for Wide Joints
- For wall and floor tile joints 3-15mm wide
- Tiles can be trafficked after 90 minutes
-
ARDITEX NA®
Rapid Setting Levelling and Smoothing Compound
- Excellent adhesion to almost all substrates without priming
- Unaffected by moisture
More projects in Leisure
-
Rose Terrace, Newmarket Racecourse
ARDEX Screed and Waterproofing Systems for new racecourse outdoor terrace bar and restaurant
-
Royal Liverpool Golf Club
Golf Clubhouse Refurbishment for the 151st Men's British Open Championship
-
Dream Pool Project, Staffordshire
Luxury Swimming Pool and Spa
-
Coalville Leisure Centre, Leicester
-
Evolution House at the Royal Botanic Gardens, Kew, London
-
Butlins Bognor Regis Pool Complex
-
The Royal Albert Hall
The perfect flooring solution for a world famous treasure
-
St Andrew Holborn
-
Where Old Meets New at Thames Lido
£3.5m restoration of a Grade II Listed Building originally opened in 1902
-
Glasgow Club Scotstoun Refurbishment
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
London 2012 Aquatics Centre
A fitting legacy from the 2012 London Olympics
-
Dundee’s New £31m Olympia Swimming Pool is Ready to Make a Splash
Old Olympia Centre replaced with state of the art facility
-
ARDEX Complete Commonwealth Games Pool Refurbishment in 8 Weeks
It’s a ‘Race to the Finish'
-
Port Solent’s Odeon Cinema Receives Premiere Refit
3 nights to complete and zero downtime
-
Gleneagles Hotel, Spa & Golf Resort
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
Elephant and Castle Leisure Centre
ARDEX help transform the Elephant and Castle area of London
-
Stratford Park Leisure Centre Swimming Pool
1000m² of tiling needing replacing at this 40 year old leisure centre
-
Duxford Air Museum
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
St George’s Chapel in Westminster Cathedral
18th century architecture meets 21st century art & technology
-
David Lloyd Leisure Refurbishment
Refurbishing Europe’s premier health & fitness provider
-
KCOM Stadium
ARDEX assist in an extensive refurbishment to the main foyer and reception area