Stratford Park Leisure Centre Swimming Pool
At 40 years old, the Stratford Park Leisure Centre was in need of refurbishment, so in 2015, Stratford District Council and Sports and Leisure Management Ltd invested £5million to improve the centre’s facilities and create a first class building for the town.
The second phase of this upgrade included renovation works on the main 33 metre swimming pool, as well as the shallow teaching pool, where 1000m² of tiling had to be removed and replaced. In conjunction with Cheshire Wellness, specialist tiling contractor W B Simpson & Sons (Midlands) Ltd were appointed to carry out the works; and opted to use an extensive range of ARDEX products throughout the installation.
Adam Willmott, Business Development Manager at ARDEX UK, specified the system of ARDEX products and said “When we conducted our first site visit to assess the work required, we saw the pool tank had been left with a very rough and uneven surface after the exiting tiles and render had been removed. This meant that we needed a system for rendering, waterproofing and tiling. In addition, due to the time constraints the contractors were under, a fast track solution was required, so our specification included products which minimised drying times and allowed the subsequent stages to commence as quickly as possible.”
“We also needed a separate system for installing the Bamberg Channels, which involved screeding the base of the channels and backfilling them. Using ARDEX S 21, the contractors were able to screed in shallow depths and quickly move on to fixing the channel blocks. “
Anthony Parrott, Director at W B Simpson & Sons (Midlands) Ltd, commented “We have been using ARDEX products for 25 years, and have worked with them on a number of swimming pool projects. We have always had a good experience with both their products and their technical support and, as a result, we decided to choose them again for this project. In addition, the client requested a fast turnaround, so they could re-open the pool to the public as soon as possible – so we were under pressure to finish quickly. ARDEX fast-track products helped us to do that.”
Products used for this project
-
ARDEX AM 100
Rapid Set One Coat Tiling Render
- Tiles can be fixed in as little as 2 hours
- Apply from 2-30mm in a single application
-
ARDEX X 77
MICROTEC® Flexible Standard Set Tile Adhesive
- Fix any tile size or type without slipping and without battens
- Spend less time mixing & more time fixing with a 3-hour pot life and 60 minute open time
-
ARDEX S 7 PLUS
Flexible Waterproof Coating for Swimming Pools
- Waterproof swimming pools prior to tiling
- Resists water pressures up to 5 Bar
-
ARDEX S 21
Rapid Setting Floor Tile Bedding Mortar
- Ideal for solid bed fixing large format tiles and natural stone
- Walk on and grout tiles after 3 hours
-
ARDEX-FLEX FL
Flexible Rapid Set Tile Grout for Wide Joints
- For wall and floor tile joints 3-15mm wide
- Tiles can be trafficked after 90 minutes
More projects in Leisure
-
Rose Terrace, Newmarket Racecourse
ARDEX Screed and Waterproofing Systems for new racecourse outdoor terrace bar and restaurant
-
Royal Liverpool Golf Club
Golf Clubhouse Refurbishment for the 151st Men's British Open Championship
-
Dream Pool Project, Staffordshire
Luxury Swimming Pool and Spa
-
Coalville Leisure Centre, Leicester
-
Evolution House at the Royal Botanic Gardens, Kew, London
-
Butlins Bognor Regis Pool Complex
-
The Royal Albert Hall
The perfect flooring solution for a world famous treasure
-
St Andrew Holborn
-
Where Old Meets New at Thames Lido
£3.5m restoration of a Grade II Listed Building originally opened in 1902
-
Glasgow Club Scotstoun Refurbishment
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
London 2012 Aquatics Centre
A fitting legacy from the 2012 London Olympics
-
Dundee’s New £31m Olympia Swimming Pool is Ready to Make a Splash
Old Olympia Centre replaced with state of the art facility
-
ARDEX Complete Commonwealth Games Pool Refurbishment in 8 Weeks
It’s a ‘Race to the Finish'
-
Port Solent’s Odeon Cinema Receives Premiere Refit
3 nights to complete and zero downtime
-
Gleneagles Hotel, Spa & Golf Resort
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
Elephant and Castle Leisure Centre
ARDEX help transform the Elephant and Castle area of London
-
Stratford Park Leisure Centre Swimming Pool
1000m² of tiling needing replacing at this 40 year old leisure centre
-
Duxford Air Museum
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
St George’s Chapel in Westminster Cathedral
18th century architecture meets 21st century art & technology
-
David Lloyd Leisure Refurbishment
Refurbishing Europe’s premier health & fitness provider
-
KCOM Stadium
ARDEX assist in an extensive refurbishment to the main foyer and reception area