The Savoy Hotel
ARDEX UK were delighted to work in partnership with Mega Marble Limited, one of the UK’s leading specialist fabricators and installers of Natural Stone and Quartz, to assist with the completion of the vast £220m restoration of London’s iconic Savoy hotel.
Managed by Fairmont Hotels and Resorts, the 268-room property on the Strand boasts nine signature suites and a newly created two-bedroom Royal Suite. Gordon Ramsay has returned to the Savoy Grill and the hotel’s banqueting rooms are already hosting events for up to 400 guests. Additional reception space is available in the new Beaufort Bar for up to 150 guests.
Mega Marble sourced, fabricated and installed a selection of their luxury marble and stonework throughout the public areas within the hotel, including the River Restaurant, Beaufort Bar, Thames Foyer, Upper Thames Foyer, Front Hall, Reading Room, Cloakrooms and lift cars.
To commence this prestigious project, ARDEX A 35 Ultra Rapid Drying Cement was used to screed the floor areas. ARDEX A 35 can be walked on after only 3 hours and is dry enough to receive floor finishes after just 24 hours, regardless of thickness. A wait of at least a month would have been required before a standard cement/sand screed would be hard and dry enough for further work to proceed.
ARDEX X 7001 Rapid Drying Pourable Floor Tile Adhesive in white was used to fix the floor tiles – incorporating ARDEX’s unique ‘RAPDRY FORMULA TECHNOLOGY’ it virtually eliminates the possibility of staining in moisture sensitive natural stone. ARDEX X 7001 has a pourable consistency that facilitates solid bed fixing, and can be walked on and grouted just two hours after fixing.
One such area where ARDEX X 7001 was used to great effect in this project was the famous Front Hall, which has been spectacularly renewed to its former glory with a newly laid, intricate design of black and white marble tiles, co-ordinating with columns clad in the same material. The installation continued under a 4 metre arch of Carrara marble leading down stairs, with marble panelling in the same material, through to The Upper Thames Foyer. Mega Marble’s work continues through the Thames Foyer to the famous River Restaurant where sparkling walls in Star Galaxy granite, and diamond patterned floors in Crema Marfil and Star Galaxy granite are simply stunning. ARDEX S 16 White Rapid Hardening and Drying Natural Stone Tile Adhesive with ARDEX E 90 Admix was used to fix the wall tiles, and once again incorporates RAPIDRY FORUMLA TECHNOLOGY to eliminate the risk of water staining.
Commenting on the project, Rafi Mimoni of Mega Marble said, “We work in many of the UKs most prestigious hotels, and our luxury marble and stonework products demand the very best in terms of adhesives. ARDEX have developed a range of tile fixing products that exceed expectations, and enable us to maintain our reputation for excellence. We were delighted with the results at The Savoy”.
Products used for this project
-
Ultra Rapid Drying Cement for Internal Screeds
ARDEX A 35
- Walkable in 3 hours
- Receives floorcoverings after 24 hours, regardless of thickness
-
ARDEX S 16
Flexible Rapid Set Tile & Stone Adhesive
- Minimises the risk of water staining, curling and warping in moisture-sensitive natural stone
- Tiles can be trafficked and grouted 2-3 hours after fixing
-
ARDEX X 7001
MICROTEC® Flexible Rapid Set Pourable Floor Tile & Stone Adhesive
- Pourable consistency ideal for solid bed fixing large format floor tiles
- Ideal for tiling onto wood-based sheets and boards
More projects in Leisure
-
Rose Terrace, Newmarket Racecourse
ARDEX Screed and Waterproofing Systems for new racecourse outdoor terrace bar and restaurant
-
Royal Liverpool Golf Club
Golf Clubhouse Refurbishment for the 151st Men's British Open Championship
-
Dream Pool Project, Staffordshire
Luxury Swimming Pool and Spa
-
Coalville Leisure Centre, Leicester
-
Evolution House at the Royal Botanic Gardens, Kew, London
-
Butlins Bognor Regis Pool Complex
-
The Royal Albert Hall
The perfect flooring solution for a world famous treasure
-
St Andrew Holborn
-
Where Old Meets New at Thames Lido
£3.5m restoration of a Grade II Listed Building originally opened in 1902
-
Glasgow Club Scotstoun Refurbishment
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
London 2012 Aquatics Centre
A fitting legacy from the 2012 London Olympics
-
Dundee’s New £31m Olympia Swimming Pool is Ready to Make a Splash
Old Olympia Centre replaced with state of the art facility
-
ARDEX Complete Commonwealth Games Pool Refurbishment in 8 Weeks
It’s a ‘Race to the Finish'
-
Port Solent’s Odeon Cinema Receives Premiere Refit
3 nights to complete and zero downtime
-
Gleneagles Hotel, Spa & Golf Resort
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
Elephant and Castle Leisure Centre
ARDEX help transform the Elephant and Castle area of London
-
Stratford Park Leisure Centre Swimming Pool
1000m² of tiling needing replacing at this 40 year old leisure centre
-
Duxford Air Museum
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
St George’s Chapel in Westminster Cathedral
18th century architecture meets 21st century art & technology
-
David Lloyd Leisure Refurbishment
Refurbishing Europe’s premier health & fitness provider
-
KCOM Stadium
ARDEX assist in an extensive refurbishment to the main foyer and reception area